
Testing and sorting out different parts
Nedschroef Schrozberg GmbH


Hardware Price: $11,343.78
ROI
12 months
100% Testing
Cycle time
8 seconds
A robolink RL-DP complete module is used to pick up various parts from a conveyor belt after machining and then place them in a gage testing machine. Once the part has been inspected, it is either discarded or transferred to a second robot which packs the part into trays.
2 Components
$11,343.78